`Miami waterfront building material selection dispute` (likely match — frame is consistent)

Appears in 1 lecture.

Appearances across the corpus

WM_Su2014_23 · Welding Metallurgy, Summer 2014 · §11.p3

Setup only — Tom begins the case at the very end of the recording. ~$70M building, ~50 yards from Biscayne Bay, Swiss architect, grand opening planned for the winter donor season. Tom received the call last March. Case body cut off by recording end.

So I guess I can now tell you a little bit of the story. Last March — middle of March — someone calls me up. A contractor here in Boston was building the Miami Art Museum. It was supposed to open last December, which it did. It was about 50 yards from Biscayne Bay. It was like a 70-million-dollar building. They were going to have a grand opening around the middle of the winter when all the people from New York, all the donors, are going to be down there. They want to have a grand opening. They had a Swiss architect, and he designed this thing —