Keystone pipeline material cost ratio

Appears in 1 lecture.

Appearances across the corpus

MSE_F2016_05 · Materials Selection, Fall 2016 · §3.p5

This ten percent figure has some variation. There are two areas where the cost of the raw material is thirty percent of the cost of building something. One is pipelines — like the Keystone pipeline from the Canadian border down to Texas — the steel pipe is going to be thirty percent of the cost of digging the hole, putting it in the ground, and everything else. The other is utility transmission towers — these big ugly things that have half-million-volt electrical lines on them.